In the Sat Lin cleaning system details are placed on special pallets and transported, with step-by-step advancement, in a series of treatment zones. The number of treatment stages and the length thereof can be adjusted by custom design. The closed ring system layout makes it possible to concentrate, if desired, on the activities of loading and unloading in a single point.
Parts treated
Gears, shafts with complex and uncommon shapes, parts of various shapes even complex ones whose overall dimensions are within (400 x 300 x 300) (H) mm
Cycle time
- Up to 15 seconds per part (standard is from 20 seconds to 1 minute per part)
Standard processes
- Washing
- Rinsing
- Compressed air blowing
- Recirculated air drying
Optional processes
- Second rinse
- Passivation
- Packaging
- Pallet rotation
- Moving ramps